6.20.2010

re:master

A couple weeks ago we tiled the master bath with some Vermont black slate that we ordered through Dal-Tile.

First we dry-fit and laid a mortar bed for the cement backerboard.



And then screwed it down with cement screws -


Then we used a wet saw to cut and dry-fit the tile using tile spacers -



Then mixed some more mortar and laid the tile...
(This is Anthony putting mesh tape over the joints in the backerboard.)



Next up was grouting the joints, after the tile had set up for a couple of days...


And sponging off the excess grout -


I'll post a final picture later - we still need to add another application of grout to the joints, since the slate isn't as smooth and flat as other tile.

And then a hand-me-down light fixture turned into a bigger project...

Some friends gave us a pretty capiz shell chandelier, which we thought would be perfect for our living room, which has had an empty junction box since we moved in. But before we could hang the fixture, we had to paint the ceiling in the living room, so we moved all the furniture out of the room and into the dining room...



But then, since we had all the furniture out of the room, we decided we might as well finish the rest of the room, so we finished caulking all the baseboards and then painted all the windows, trim and fireplace...






So now we've decided to take one room at a time, and finish everything in the room. It's less daunting to have smaller milestones...

7.24.2008

re:pose

the wood floors in the family room / office / powder room are finished! we are conveniently going out of town for the weekend, so they'll have a few days to cure and then we can finally move into the family room! yay!



[i love that you can't even tell we had to infill some flooring]




the floor guys also prefinished our stair treads for us, so anthony and i are going to attempt to install them ourselves (along with the risers, trim, etc). this is no easy DIY task - so wish us luck!

7.19.2008

re:location

it was a productive saturday! (with others doing most of the work - even better!)

the guys from the city's department of urban forestry finally made it over here to grind out the stump of the tree out front. it took them a few hours and was pretty impressive to watch...






(see the termite tracks through the center of the stump...??)


they left all the wood shavings for us -


so anthony relocated most of them to fill in our low mud-prone driveway.




i suppose we'll use the rest as mulch (or is this a bad idea for some reason i'm unaware?).

the wood floors guys also came today to sand and stain the family room, office and powder room as well.








the whole house smells strongly of wood stain right now, so we have windows and doors open and fans blowing to clear it out by bedtime.

they will apply the first coat of poly on monday, and hopefully get all the coats down before we go out of town next weekend, so they can cure while we're away. then we can finally move into our family room! we have our new 46" LCD still in the box ready to go up on the wall, and some furniture being delivered in about 3 weeks.

7.16.2008

re:fill

our wood floor guys got to work today on the family room! they staggered in new boards where the old bathroom used to be and filled in a couple holes that were former supply registers.



i'm not sure if a sanding crew is starting today or tomorrow. stay tuned for sanding and finishing!

6.01.2008

re:newable

we installed the cork floor in our pantry today! it's a floating cork floor, so it didn't need any adhesive and just snapped in place. it has great cushion and is very soft underfoot. i think it looks great!




we'll get our floor guys to make a threshold -




we also put the roof on the shed this weekend. by "we" i mean anthony...






i helped a bit lifting the plywood up there and holding things, but anthony was the workhorse this weekend (along with his trusty honda)...


hopefully we can finish cladding the shed next weekend - and we just have to figure out what we're going to do for the door. it's going to be on barn door slider hardware like the pantry door.

12.10.2007

re:stain

our wood floors have been sanded, and staining started today!
photos pre-stain:




our wood floor guys also did some minor carpentry work, like this nosing at the loft -


and some thresholds -


the stain is a color called 'spice brown' on the old wood and a 50/50 mix of 'english chestnut' and 'spice brown' on the new wood (since it's much more yellow and doesn't have the red undertones of the old wood)...










pics after first of three coats of poly...






we also have some plumbing work nearing completion -


yay! move-in is scheduled for this weekend!

12.05.2007

re:finish

*sigh*
we just accepted a proposal to have a professional refinish our hardwood floors. anthony started last night and it's just going to be too difficult for him to do in such a short time frame, since we won't be able to work on it this weekend because we'll be out of town for my sister's wedding, and we want to move in next weekend. we met a couple of flooring guys out there today, got one proposal from a guy who can start immediately because he's also working on a neighbor's house across the street, and we're going for it. so...ordering appliances will have to wait. :(

12.02.2007

re:tile

anthony and i spent the weekend tiling! it went really well! we completed both the laundry room and guest bathroom.

first we troweled a thin bed of mortar to lay the durock (cement backerboard for the tile)...


then we used cement screws to help attach the durock to the subfloor...


after all the durock was down, we put fiberglass mesh tape over the seams, then laid out the tile to dry-fit it and cut any pieces that needed cutting...


next, thin-set mortar and laying tile:


the tile is called "windmill" and came in 12x24" sheets, with the individual tiles attached on the underside with a tab of glue or something.

smearing grout into the spaces (we went with "pewter" grout)...




sponging off the excess grout -


ta-da! our beautiful new bathroom floor!


we have to wait two days for the grout to cure before we can seal it.
then ready for our tub, toilet & pedestal sink!


i'm so excited and proud of our handiwork this weekend!

this is actually quite physical work - i'm rather sore this evening...my back hurts, my legs are sore, my hands are sore, my shoulders are sore. i also have a lovely blister on my hand from troweling.

can't wait to get a working bathroom!